All projects

Sattva · Neopolis, Kokapet

Sattva Lake Ridge

Sattva Lake Ridge is a high-rise residential community in Neopolis, Kokapet, one of Hyderabad’s prominent growth corridors. The supplied project brief describes six G+37 towers across 9.5 acres, with lake views and an IGBC Gold-rated design.

Sattva Lake Ridge project plan

Site

9.5 acres · 6 towers

Height

G+37 floors

Homes

3, 4 and 5 BHK

Area range

2,744–5,472 sq. ft. per supplied brief

Clubhouse

65,000 sq. ft.

Design

IGBC Gold-rated · lake view

Ceilings

12-ft floor-to-floor height

Windows

Floor-to-ceiling, double-glazed glass

Plans and layouts

Explore the project plan

Select the plan to open a larger view. Final plans and inventory are subject to confirmation by Sattva.

Sattva Lake Ridge master plan
Community spaces

Amenities shown in the supplied plan

1

Swimming pool

2

Kids’ pool

3

Multipurpose court

4

Tennis court

5

Badminton court

6

Children’s play area

7

Toddler play area

8

Amphitheatre

9

Seating deck under pergola

10

Cricket pitch

11

Outdoor fitness station

12

Elderly seating under pergola

13

Pet park

14

Jogging track and pathway

15

Clubhouse

16

Visitors’ car parking

17

Landscaped lawn and stepping-stone paths

From supplied project materials

Project details

Project overview

  • •9.5 acres with six residential towers
  • •G+37 floors
  • •3, 4 and 5 BHK homes
  • •65,000 sq. ft. clubhouse
  • •Lake-view setting in Neopolis, Kokapet

Home features

  • •12-ft floor-to-floor height, as supplied in the project brief
  • •Floor-to-ceiling windows
  • •Double-glazed glass
  • •IGBC Gold-rated environmental design

Landscape plan

  • •Swimming and kids’ pools
  • •Sports courts, cricket pitch and outdoor fitness station
  • •Jogging paths, landscaped lawns and seating pergolas
  • •Children’s and toddler play areas, amphitheatre and pet park
Indicative price information

Sattva Lake Ridge pricing

Pricing is shown as provided in the supplied price sheet and may have changed. Contact Kairos or Sattva for a current written quote.

Configuration / chargeAreaPrice / amount
3.5 BHK2,744 sq. ft. · ₹12,100/sq. ft.₹3,60,84,912
3.5 BHK2,751 sq. ft. · ₹12,100/sq. ft.₹3,61,74,848
3.5 BHK + deck2,979 sq. ft. · ₹12,100/sq. ft.₹3,91,04,192
4 BHK3,983 sq. ft. · ₹12,300/sq. ft.₹5,32,00,184
4 BHK4,046 sq. ft. · ₹12,300/sq. ft.₹5,44,22,208
5 BHK5,218 sq. ft. · ₹13,200/sq. ft.₹7,44,10,664

Totals transcribed from the supplied Lake Ridge price sheet and include its listed infrastructure, legal/documentation and maintenance/corpus amounts. GST/TDS as applicable and stamp duty/registration on actual are additional. Premium-facing charge is listed at ₹500/sq. ft.; maintenance at ₹4.50/sq. ft./month. Prices may change without notice.

Want current availability or pricing?

Contact Kairos to ask about unit availability, current pricing, inclusions and a site visit.

Project information and prices are summarized from user-supplied notes, brochures, plans and price sheets. Availability, pricing, taxes, charges, approvals and specifications may change; confirm details and current documents directly with Sattva before making a purchase decision.

Call WhatsApp Site visit